*On the 4th April 2019, the system estimated a cable search to take 5.11 working days.  This was 1.29 days faster than the last sample day (04 March 19).
**On the 4th April 2019, the system estimated an independent utilities search to take 7.94 working days.  This was 0.2 working days faster than the last sample day (04 March 19).
***From 1/4/2017 Cornerstone now authorised providers of Scottish Water plans
****During April 17, New ordering system for SGN means plans instant from April 2017
*****During August 17, New ordering system for UK Power means plans instant from mid August 17 – Price also dropped for £75+VAT to £41.66+VAT
******During January 18, UK Power Distribution increased it’s price from £9.00 to £12.50
*******During April 18, New ordering system for Northern Power Grid (not Yorkshire) means plans instant from mid April 17.
********During May 18, Bournemouth and Hamps, Welsh Water, Northumbrian Water, South Staffs Water and Essex and Suffolk Water all changed their prices
*********During October 18, Thames Water changed it’s price
**********During November 18, Severn Trent took over Dee Valley am renamed it Hafren dyfrdwy and made it’s prices in line with Severn Trent
***********On April 1 2019, Northumrian Water, South East Water and United Utilities increased their prices. Welsh Water decreased their prices
************As at April 2019, GTT have amalgamated the GTT, Vtesse and Interoute networks under one network/plan. The cost for us to search this is £15.00+VAT.
Figures as at 04/04/2018 for average plan delivery time based on last 5 responses received from Cornerstone Projects Ltd. Costs are for sites no larger than 200mx200m. Prices ex VAT


Check out how the utility companies performed last month by clicking here.


Providing Professional Services to
the UK Construction Industry.
Privacy Statement